Reconstruction of bridge crane Snina 12,5t-15,9m
Year or realization | 2018 |
Customer | PRESBETON Nova, s.r.o. |
Place of installation | Production plant of PRESBETON Nova, s.r.o. in Bystrovany |
Range of delivery |
Task:
Reconstruction of the existing double-girder bridge crane of SNINA, type 12,5t/15,9m + delivery of a new power supply trolley + communication with the control system of the concrete plant + geometric survey of the crane way.
Solution:
The following deliveries and works were realized:
- demounting of existing components of the crane in place of operation
- delivery and mounting of a new GIGA hoist, type GHM 25000-14-2/1-6M,D
- delivery and mounting of a new hoist power supply – energy chain
- delivery and mounting of a new crane electric cabinet
- delivery and mounting of a new radio control
- delivery and mounting of new crane travel motors, including brakes
- delivery and mounting of a new crane power supply trolley, length 110m
- new documentation and crane marking
- revision and test of the crane
|